11.07.2022 Aufrufe

atw - International Journal for Nuclear Power | 04.2022

Ever since its first issue in 1956, the atw – International Journal for Nuclear Power has been a publisher of specialist articles, background reports, interviews and news about developments and trends from all important sectors of nuclear energy, nuclear technology and the energy industry. Internationally current and competent, the professional journal atw is a valuable source of information. www.nucmag.com

Ever since its first issue in 1956, the atw – International Journal for Nuclear Power has been a publisher of specialist articles, background reports, interviews and news about developments and trends from all important sectors of nuclear energy, nuclear technology and the energy industry. Internationally current and competent, the professional journal atw is a valuable source of information.

www.nucmag.com

MEHR ANZEIGEN
WENIGER ANZEIGEN

Erfolgreiche ePaper selbst erstellen

Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.

atw Vol. 67 (2022) | Ausgabe 4 ı Juli

46

Grohnde

REPORT

Operating sequence in 2021

100

90

80

70

60

50

40

30

20

10

Electrical output in %

January February March April May June July August September October November December

The Grohnde nuclear power plant was off the grid for a 26.7-day

100

overhaul with refuelling in the 2021 reporting year and achieved a

time 80 availability of 92.7 %. Gross generation amounted to

11,093,345.5 MWh.

60

The 2021 revision was also carried out with an elaborate protection

concept against Corona-19 for the personnel working in the

40

KWG. The last revision ended 13 hours earlier than originally

planned 20 when the grid was switched off on 15 April 2021.

According to the specifications of the load dispatcher, 6 load

0

reductions took place in 2021 for a total of 134 hours, as well as 151

grid and 108 primary controls for a total of 4,940 hours.

100

Planned 80 shutdowns

20 March to 15 April 2021: 38 th Refuelling and major annual

60

revision:

Nuclear power plant Grohnde was shut down as scheduled.

40

The main planned works during this year’s revision were:

• 20Unloading and loading with the replacement of 28

fresh fuel elements.

• 0Full inspection of 19 fuel elements.

• Eddy current test of 28 control elements.

• Visual inspection of 15 flow restrictor assemblies.

• XA Leak rate test.

• GY40/80 Maintenance level W5

incl. visual inspection of cylinder liners.

• Main redundancy 4/8 with rail inspection, branch inspections,

capacity inspections, valve and actuator inspections, tank inspections.

• VC10/30 D001 Engine revision/engine replacement.

• Special inspection programme of 55 storage assemblies in the

reactor protection system.

• During the inspection of the fuel assemblies, 2 fuel assemblies

with slight corner damage were located. These fuel assemblies

were replaced by fuel assemblies with similar burn-up behaviour.

Unplanned shutdowns and reactor/turbine trip

None.

Power reductions above 10 % and longer than for

24 h

In the months of January, February, March, May, November

and December, load-following operation due to requirements

of the load of the load dispatcher.

Delivery of fuel elements

In January 2021 28 U-/U-Gd-fuel elements were delivered.

• Start-up inspection of the fuel element centring pins

Waste management status

of the Positionierung:

UKG and OKG.

Between September and November 2021, a total of three

• TF40 Bezug, B001 Cleaning links, the unten nuclear intercooler.

CASTOR © -V/19 containers were dispatched to the ZL-KWG.

• TF40 X D001 = 20,475 Inspection Y of = the 95,25 intercooler pump. B = 173,5 H = 38,2

• TF20/30 VGB: S013/014 HKS6K Screw 30 % replacement

General points/management systems

on the quick-acting dampers.

atw: 100 60 0 0

In September 2021, the monitoring audit of the quality

• Pressure test of the recuperative heat exchanger TA00B001,

management system (ISO 9001) and the recertification of

• Internal and pressure inspection of HP cooler TA11/12 B001

and volume compensation tank TA20 B001.

the environmental management system (ISO 14001) and

• TH40/48 D001 Inspection of aftercooling and pool pump, the occupational health and safety management system

• Internal and pressure test of the feed water

(OHSAS 18001) were successfully carried out.

HP preheating section.

Report

Operating results 2021