atw - International Journal for Nuclear Power | 04.2022
Ever since its first issue in 1956, the atw – International Journal for Nuclear Power has been a publisher of specialist articles, background reports, interviews and news about developments and trends from all important sectors of nuclear energy, nuclear technology and the energy industry. Internationally current and competent, the professional journal atw is a valuable source of information. www.nucmag.com
Ever since its first issue in 1956, the atw – International Journal for Nuclear Power has been a publisher of specialist articles, background reports, interviews and news about developments and trends from all important sectors of nuclear energy, nuclear technology and the energy industry. Internationally current and competent, the professional journal atw is a valuable source of information.
www.nucmag.com
Erfolgreiche ePaper selbst erstellen
Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.
atw Vol. 67 (2022) | Ausgabe 4 ı Juli
43
Operating data
Review period 2021
REPORT
Plant operator: PreussenElektra GmbH
Shareholder/Owner: PreussenElektra GmbH (80 %),
Vattenfall Europe Nuclear Energy GmbH (20 %)
Plant name: Kernkraftwerk Brokdorf (KBR)
Address: PreussenElektra GmbH, Kernkraftwerk Brokdorf,
25576 Brokdorf, Germany
Phone: 04829 752560, Telefax: 04829 511
Web: www.preussenelektra.de
First synchronisation: 10-14-1986
Date of commercial operation: 12-22-1986
Design electrical rating (gross):
1,480 MW
Design electrical rating (net):
1,410 MW
Reactor type:
PWR
Supplier:
Siemens/KWU
100
90
80
70
60
50
Availability factor in %
Capacity factor in %
93
93
93
90
78
81
93
The following operating results were achieved:
Operating period, reactor:
8,760 h
Gross electrical energy generated in 2021: 12,032,352 MWh
Net electrical energy generated in 2021: 11,436,585 MWh
Gross electrical energy generated since
first synchronisation until 12-31-2021:
383,305,680 MWh
Net electrical energy generated since
first synchronisation until 12-31-2021:
364,336,660 MWh
Availability factor in 2021: 100.00 %
Availability factor since
date of commercial operation: 90.09 %
Capacity factor 2021: 92.59 %
Capacity factor since
date of commercial operation: 85.98 %
Downtime
(schedule and forced) in 2021: 0.00 %
Number of reactor scrams 2021: 0
40
30
20
10
0
10
9
8
93
2014
93
93
44
52
91
88
2015 2016 2017 2018 2019
Collective radiation dose of own
and outside personnel in Sv
91
2020
100
2021
Licensed annual emission limits in 2021:
Emission of noble gases with plant exhaust air:
1.0 · 10 15 Bq
7
6
Emission of iodine-131 with plant exhaust air:
Emission of nuclear fission and activation products
with plant waste water (excluding tritium):
6.0 · 10 9 Bq
5.55 · 10 10 Bq
5
4
Proportion of licensed annual emission limits
for radioactive materials in 2021 for:
Emission of noble gases with plant exhaust air: 0.06 %
Emission of iodine-131 with plant exhaust air: 0.00 %
Emission of nuclear fission and activation products
with plant waste water (excluding tritium): 0.0000 %
Collective dose:
0.006 Sv
3
2
1
0
0.17
2014
0.14
2015
0.14
2016
0.13
2017
0.14
2018
0.16
2019
0.13
2020
0.01
2021