11.07.2022 Aufrufe

atw - International Journal for Nuclear Power | 04.2022

Ever since its first issue in 1956, the atw – International Journal for Nuclear Power has been a publisher of specialist articles, background reports, interviews and news about developments and trends from all important sectors of nuclear energy, nuclear technology and the energy industry. Internationally current and competent, the professional journal atw is a valuable source of information. www.nucmag.com

Ever since its first issue in 1956, the atw – International Journal for Nuclear Power has been a publisher of specialist articles, background reports, interviews and news about developments and trends from all important sectors of nuclear energy, nuclear technology and the energy industry. Internationally current and competent, the professional journal atw is a valuable source of information.

www.nucmag.com

MEHR ANZEIGEN
WENIGER ANZEIGEN

Erfolgreiche ePaper selbst erstellen

Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.

atw Vol. 67 (2022) | Ausgabe 4 ı Juli

43

Operating data

Review period 2021

REPORT

Plant operator: PreussenElektra GmbH

Shareholder/Owner: PreussenElektra GmbH (80 %),

Vattenfall Europe Nuclear Energy GmbH (20 %)

Plant name: Kernkraftwerk Brokdorf (KBR)

Address: PreussenElektra GmbH, Kernkraftwerk Brokdorf,

25576 Brokdorf, Germany

Phone: 04829 752560, Telefax: 04829 511

Web: www.preussenelektra.de

First synchronisation: 10-14-1986

Date of commercial operation: 12-22-1986

Design electrical rating (gross):

1,480 MW

Design electrical rating (net):

1,410 MW

Reactor type:

PWR

Supplier:

Siemens/KWU

100

90

80

70

60

50

Availability factor in %

Capacity factor in %

93

93

93

90

78

81

93

The following operating results were achieved:

Operating period, reactor:

8,760 h

Gross electrical energy generated in 2021: 12,032,352 MWh

Net electrical energy generated in 2021: 11,436,585 MWh

Gross electrical energy generated since

first synchronisation until 12-31-2021:

383,305,680 MWh

Net electrical energy generated since

first synchronisation until 12-31-2021:

364,336,660 MWh

Availability factor in 2021: 100.00 %

Availability factor since

date of commercial operation: 90.09 %

Capacity factor 2021: 92.59 %

Capacity factor since

date of commercial operation: 85.98 %

Downtime

(schedule and forced) in 2021: 0.00 %

Number of reactor scrams 2021: 0

40

30

20

10

0

10

9

8

93

2014

93

93

44

52

91

88

2015 2016 2017 2018 2019

Collective radiation dose of own

and outside personnel in Sv

91

2020

100

2021

Licensed annual emission limits in 2021:

Emission of noble gases with plant exhaust air:

1.0 · 10 15 Bq

7

6

Emission of iodine-131 with plant exhaust air:

Emission of nuclear fission and activation products

with plant waste water (excluding tritium):

6.0 · 10 9 Bq

5.55 · 10 10 Bq

5

4

Proportion of licensed annual emission limits

for radioactive materials in 2021 for:

Emission of noble gases with plant exhaust air: 0.06 %

Emission of iodine-131 with plant exhaust air: 0.00 %

Emission of nuclear fission and activation products

with plant waste water (excluding tritium): 0.0000 %

Collective dose:

0.006 Sv

3

2

1

0

0.17

2014

0.14

2015

0.14

2016

0.13

2017

0.14

2018

0.16

2019

0.13

2020

0.01

2021

Report

Operating results 2021

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!