atw - International Journal for Nuclear Power | 04.2022
Ever since its first issue in 1956, the atw – International Journal for Nuclear Power has been a publisher of specialist articles, background reports, interviews and news about developments and trends from all important sectors of nuclear energy, nuclear technology and the energy industry. Internationally current and competent, the professional journal atw is a valuable source of information. www.nucmag.com
Ever since its first issue in 1956, the atw – International Journal for Nuclear Power has been a publisher of specialist articles, background reports, interviews and news about developments and trends from all important sectors of nuclear energy, nuclear technology and the energy industry. Internationally current and competent, the professional journal atw is a valuable source of information.
www.nucmag.com
Erfolgreiche ePaper selbst erstellen
Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.
atw Vol. 67 (2022) | Ausgabe 4 ı Juli
42
Brokdorf
REPORT
Operating sequence in 2021
100
90
80
70
60
50
40
30
20
10
Electrical output in %
January February March April May June July August September October November December
The Brokdorf nuclear power plant (KBR) was online for a total of
100
8,760 operating hours in 2021 with a capacity factor of 99.4 %.
Gross 80 generation for the reporting year was 12,032 GWh.
No plant overhauls or refuelling took place in the 2021 operating
60
year.
40
20
Planned shutdowns
On 31 December 2021 24:00 hrs, KBR’s authorisation for
0
power operation, as stipulated in the revised Atomic Energy
Act (2011), expired. At the same time, the 33 rd operating
100
cycle ended after 434 operating days with the shutdown of
the 80 plant. The turbo generator set was taken off the grid at
23:59 on 31 December 2021.
60
40
Unplanned shutdowns and reactor/turbine trip
None. 20
0
Power reductions above 10 % and longer than for 24 h
None.
Delivery of fuel elements
Positionierung:
None.
Bezug, links, unten
X = 20,475 Y = 95,25 B = 173,5 H = 38,2
Waste management status
By the VGB: end of HKS6K the year 30 2021 % 35 loaded CASTOR © cask were
located atw: the 100 on-site 60 intermediate 0 0 storage Brokdorf.
Report
Operating results 2021