11.07.2022 Aufrufe

atw - International Journal for Nuclear Power | 04.2022

Ever since its first issue in 1956, the atw – International Journal for Nuclear Power has been a publisher of specialist articles, background reports, interviews and news about developments and trends from all important sectors of nuclear energy, nuclear technology and the energy industry. Internationally current and competent, the professional journal atw is a valuable source of information. www.nucmag.com

Ever since its first issue in 1956, the atw – International Journal for Nuclear Power has been a publisher of specialist articles, background reports, interviews and news about developments and trends from all important sectors of nuclear energy, nuclear technology and the energy industry. Internationally current and competent, the professional journal atw is a valuable source of information.

www.nucmag.com

MEHR ANZEIGEN
WENIGER ANZEIGEN

Erfolgreiche ePaper selbst erstellen

Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.

atw Vol. 67 (2022) | Ausgabe 4 ı Juli

42

Brokdorf

REPORT

Operating sequence in 2021

100

90

80

70

60

50

40

30

20

10

Electrical output in %

January February March April May June July August September October November December

The Brokdorf nuclear power plant (KBR) was online for a total of

100

8,760 operating hours in 2021 with a capacity factor of 99.4 %.

Gross 80 generation for the reporting year was 12,032 GWh.

No plant overhauls or refuelling took place in the 2021 operating

60

year.

40

20

Planned shutdowns

On 31 December 2021 24:00 hrs, KBR’s authorisation for

0

power operation, as stipulated in the revised Atomic Energy

Act (2011), expired. At the same time, the 33 rd operating

100

cycle ended after 434 operating days with the shutdown of

the 80 plant. The turbo generator set was taken off the grid at

23:59 on 31 December 2021.

60

40

Unplanned shutdowns and reactor/turbine trip

None. 20

0

Power reductions above 10 % and longer than for 24 h

None.

Delivery of fuel elements

Positionierung:

None.

Bezug, links, unten

X = 20,475 Y = 95,25 B = 173,5 H = 38,2

Waste management status

By the VGB: end of HKS6K the year 30 2021 % 35 loaded CASTOR © cask were

located atw: the 100 on-site 60 intermediate 0 0 storage Brokdorf.

Report

Operating results 2021