Installation recommendation for frames of model: UG<br />

for masonry<br />

1<br />

1. Before the installation, check whether the steel frame with the design specifications of the client corresponds to (e.g. with respect<br />

to profiling, width and height dimensions, hinge substructures, DIN-direction etc.) and check that the angles of the frame are correct.<br />

If this is not the case, the right or left side needs to be diagonally realigned by careful hammering.<br />

2. Knock mortar infill openings into the masonry for back-throwing/back-pouring on the opposite side to the rebate (in each case at<br />

the height of the top hinge and if necessary also around the head section). Define the metre mark on the masonry.<br />

3. Introduce the frame into the wall opening. Align the frame‘s metre mark with the metre mark on the masonry. Note: top edge of the<br />

finished floor can be higher than the bottom edge of the frame. Please note floor recess marking.<br />

4. Measure the rebate dimension width on the head section. Safeguard this measurement by means of a spacer board in the frame<br />

centre in order to avoid the frame bending when back-filling. In order to prevent the head section from bending when working<br />

with larger rebate dimension widths, an additional vertical spacer board for maintaining the rebate dimension height is advisable.<br />

5. Wedge the frame together with the masonry at the four corners of the head section. Ensure equal distance between masonry<br />

and frame.<br />

6. Check again that the frame fits properly in place and if necessary correct.<br />

7. Hook in quick-fit anchors and secure to masonry.<br />

8. Introduce an earth-moist cement and mortar mix (c. 1:4) through the infill openings and completely back-fill the entire frame,<br />

including head section. Complete back-filling with mortar can be achieved by targeted knocking on the reveal.<br />

9. After back-filling, clean frame of any mortar remnants.<br />

10. After the mortar has set and before putting down the screed, remove spacer rails.<br />

Alternatively, a backfill with an approved OCF ist possible. Please refer to the manufacturer‘s recommendation and DIN.<br />

For elements with requirements are always the specifications in the authorization observed.<br />

11. Fitting the seal: do not fit the seal supplied with the frame until the frame‘s paint has dried. Do not use any nitro-based paints.<br />

Pay attention to painting recommendations. When pulling in the seal, do not stretch it. Create flush mitre joints (head section<br />

end-to-end). Only ever clean dirty seals carefully with washing up liquid.<br />

Height-align the frame as per the metre mark and floor recess mark (frames with floor recess only) and fix in place.<br />

2<br />

Align the frame generally vertically and<br />

horizontally and check by measuring the<br />

diagonals. Check by eyeing them up that<br />

the two edges are running parallel to one<br />

another.<br />

Viewing direction<br />

1<br />

2 1 2<br />

1<br />

For the back-filling process, the steel frame must be braced in such a way that the bending of the<br />

profiles that is to be expected gets absorbed and the frame rebate dimension is maintained across<br />

the full height. In relation to back-filling materials used (mortar and additives, silicon, wall plugs,<br />

rock wool, etc.), the manufacturer‘s instructions for working with them must be followed. They must,<br />

however, be free of any corrosive or hygroscopic components, e.g. antifreeze or gypsum.<br />

The spacer brackets are needed to maintain the frame rebate dimension and clear opening<br />

measurement and should only be removed after installation (when the back-fill material has set<br />

hard). Stop rails, spacer brackets, floor profiles etc. or such like that remain in the floor structure<br />

should have appropriate material laid under them up to the unfinished floor and safeguarded<br />

against bending through being stepped on or run over.<br />

Please always observe the current standards.<br />

Subject to technical changes<br />

1.25.02