Art. 5.17.5.5<br />

Annexes<br />

Fuelling places for motor vehicles for P1 and/or P2 products are always in the open air and on<br />

the premises of the establishment. The floor of the aforementioned parking place is impervious<br />

and sufficiently supporting. The gro<strong>und</strong> is to be provided with the necessary gradients and possible<br />

raised edges to ensure that any spilled flammable fuels run off to a collector and are removed<br />

in accordance with regulatory provisions.<br />

No trenches, crawl spaces or rooms may be present <strong>und</strong>er the aforementioned filling position.<br />

Art. 5.17.5.6<br />

Each fixed container which forms part of a distribution installation for the filling of motor vehicles<br />

must be equipped with its own filler pipe.<br />

The filling point for P1 and/or P2 products :<br />

1. is at a horizontal projection at least 2 m distance from the edge of the container<br />

2. may not be in a closed or open building<br />

3. must be located at least 3 m from any basement space and from the bo<strong>und</strong>aries of the parcels<br />

of third parties.<br />

Art. 5.17.5.7<br />

§ 1. As regards existing fuel distribution installations for motor vehicles, the specific transitional<br />

period in article 3.2.1.2, § 3, b) for the specified construction requirements in article<br />

5.17.5.5 and 5.17.1.17, 6. may be brought to:<br />

1. 1 January 1999 for all distribution installations fitted with directly buried in the gro<strong>und</strong> single-walled<br />

metal containers located inside water abstraction areas and protected zones<br />

2. 1 January 2002 for all distribution installations, other than those mentioned sub 1., fitted with<br />

directly buried in the gro<strong>und</strong> single-walled metal containers which were built before 1975,<br />

whereby it is assumed that the containers were built before 1975 if the age cannot be demonstrated<br />

3. 1 January 2005 for all other distribution installations.<br />

For existing containers or existing discharges of industrial sewage, the same derogation can<br />

apply as in article 5.17.1.4, § 2, article 5.17.2.11, § 5 and article 3.2.1.2, § 3, b, as regards the<br />

realisation of the requirements made in appendix 5.3.2, 52°, c).<br />

§ 2. The operator can only be granted the exception as referred to in § 1 <strong>und</strong>er the explicit condition<br />

that he, no later than on 1 January 1998, has bo<strong>und</strong> himself to the following by registered<br />

mail to the Environmental Licence Department and the Environmental Inspection Department:<br />

1. to ensure that the containers will meet the conditions of these regulations for new containers<br />

before the date set in § 1, except for that regarding the location regulations (in particular the<br />

prohibitory rules and stipulations of distances to be observed)<br />

2. the further operation of the fuel distribution installation will be definitively stopped from the<br />

date in § 1 in the event of the <strong>und</strong>ertaking in sub 1. not being achieved.<br />

Waste Water and Waste Gas Treatment 401

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!