06.12.2012 Aufrufe

BVT-Merkblatt zu Abwasser- und Abgasbehandlung

BVT-Merkblatt zu Abwasser- und Abgasbehandlung

BVT-Merkblatt zu Abwasser- und Abgasbehandlung

MEHR ANZEIGEN
WENIGER ANZEIGEN

Erfolgreiche ePaper selbst erstellen

Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.

Annexes<br />

§ 9. In existing tank farms which do not dispose of an impervious b<strong>und</strong> and which are located<br />

outside a water abstraction area or a protected zone, within a period of 24 months after the date<br />

of the coming into force of this order observation pipes must be installed in accordance with the<br />

provisions of article 5.17.3.12.<br />

Art. 5.17.3.20<br />

§ 1. If leaks are observed the operator will take all the measures required to avoid the danger of<br />

explosion and restrict further soil and gro<strong>und</strong>water pollution to the extent possible.<br />

§ 2. After professional repairs the container may only be brought back into use if a certificate<br />

has been issued by an environmental expert accredited in the discipline containers for gases or<br />

hazardous substances or by an authorised expert or by a technician accredited for the storage of<br />

P3 and/or P4 products intended for the heating of buildings. From this certificate it must clearly<br />

appear that the container and the installation comply with the requirements referred to in this<br />

order.<br />

§ 3. With the final putting out of use of containers, whether or not due to leaks, the container<br />

must be emptied, cleaned and removed within a period of 36 months without prejudice to the<br />

provisions of the decree of 2 July 1981 concerning the prevention of waste and waste materials<br />

management and its implementing decisions.<br />

If it is impossible to remove the container within this period, after consultation with an environmental<br />

expert accredited in the discipline containers for gases or hazardous substances or<br />

with an authorised expert or with a technician accredited for the storage of P3 and/or P4<br />

products intended for the heating of buildings, the container must be emptied, cleaned and<br />

filled with sand, foam or an equivalent inert material. Here the necessary measures must be<br />

taken for explosion protection and to prevent soil and gro<strong>und</strong>water pollution.<br />

§ 4. Liquid leaks which have caused gro<strong>und</strong> pollution or spillage into the sewer system, the surface<br />

waters, the gro<strong>und</strong>water layers or onto adjacent properties must be immediately reported<br />

by the operator to the Environmental Inspection Department, to the Governor of the Province<br />

and to the Burgomaster.<br />

Section 5.17.4 Control of the emission of volatile organic compo<strong>und</strong>s (VOC) with the<br />

storage and transferring of petrol<br />

Art. 5.17.4.1<br />

The provisions of this section are applicable to the establishments as referred to in the subsection<br />

17.3.4 and the establishments as referred to in subsection 17.3.9 of the classification list, to<br />

the extent these establishments concern the collection, storage and transferring of petrol.<br />

Art. 5.17.4.2<br />

§ 1. Without prejudice to the other conditions in these regulations, the storage installations<br />

must comply with the technical regulations of appendix 5.17.9, § 2.<br />

§ 2. As a derogation from § 1, existing storage installations must comply with the provisions of<br />

§ 1:<br />

1. from 1 January 1999 for storage installations with a turnover greater than 50000 tonnes per<br />

year, measured during the years 1996 and 1997<br />

398 Waste Water and Waste Gas Treatment

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!