06.12.2012 Aufrufe

BVT-Merkblatt zu Abwasser- und Abgasbehandlung

BVT-Merkblatt zu Abwasser- und Abgasbehandlung

BVT-Merkblatt zu Abwasser- und Abgasbehandlung

MEHR ANZEIGEN
WENIGER ANZEIGEN

Sie wollen auch ein ePaper? Erhöhen Sie die Reichweite Ihrer Titel.

YUMPU macht aus Druck-PDFs automatisch weboptimierte ePaper, die Google liebt.

Annexes<br />

4. a pressure test on any heating pipes.<br />

For category 3 storage of P3 and/or P4 products, only the limited inspection mentioned in § 1<br />

has to take place.<br />

§ 3. The periodic investigations must be carried out by an environmental expert accredited in<br />

the discipline containers for gases or hazardous substances or by an authorised expert, or for<br />

storage places for P3 and/or P4 products intended for the heating of buildings by an accredited<br />

technician.<br />

Art. 5.17.3.17<br />

Following the inspections described in article 5.17.3.4 with installation and/or the periodic investigations<br />

referred to in article 5.17.3.16, the experts or the accredited technician draw up a<br />

certificate from which it unambiguously appears whether or not the installation complies with<br />

the conditions of these regulations. The aforementioned certificate also mentions the name and<br />

the accreditation number of the expert or accredited technician who has conducted the inspection.<br />

Except in the case of a tank farm, a clearly visible sticker or plate is to be applied to or near the<br />

filler pipe on which the accreditation number, the year and the month of the control with installation<br />

and the last inspection are mentioned.<br />

The sticker or plate has the following colour:<br />

1. green, when the container and the installation comply with the provisions of these regulations<br />

2. orange, when the container and the installation do not comply with the provisions of these<br />

regulations, but the faults established cannot cause pollution outside the container<br />

3. red, when the container and the installation do not comply with the provisions of these regulations<br />

and the faults observed can lead or have led to pollution outside the container.<br />

Art. 5.17.3.18<br />

Only containers of which the filler pipe is provided with a green sticker or plate, as referred to<br />

in article 5.17.3.17, third subsection, 1., may be filled, replenished and operated.<br />

Containers of which the filler pipe is provided with an orange sticker or plate, as referred to in<br />

article 5.17.3.17, third paragraph, 2., may still be filled or replenished for a transitional period<br />

of a maximum of six months. This period starts on the first day of the month following the<br />

month mentioned on the relative orange sticker or plate. In this case a new control must take<br />

place before the expiry of aforementioned term.<br />

Containers of which the filler pipe is provided with a red sticker or plate, as referred to in article<br />

5.17.3.17, third subsection, 3., may in no event be filled or replenished.<br />

Art. 5.17.3.19<br />

§ 1. The following are considered as existing containers for the storage of P1, P2, P3 or P4<br />

products:<br />

1. containers of which operation was licensed on 1 January 1993 or for which the application<br />

for the renewal of the environmental licence was being processed on the aforementioned date<br />

by the competent authority<br />

2. containers which on 1 September 1991 were already in use, and without the application of<br />

title I of the General Regulations for Labour Safety were not classified as hazardous, unhealthy<br />

or nuisance-producing establishments<br />

3. containers for which before 1 July 1993 notification was provided in accordance with the<br />

provisions of Title I of VLAREM.<br />

396 Waste Water and Waste Gas Treatment

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!