Annexes<br />

The observation pipes (measuring wells) are to be made of a material that cannot be affected by<br />

the stored liquids.<br />

The whole length of the piping is to be provided as filter piping; it is to have an internal diameter<br />

of at least 5 cm, reach a minimum of 1 m deeper than the lowest level of the phreatic<br />

gro<strong>und</strong>water table and be sealed above.<br />

Unless specified otherwise in the environmental licence, at least three observation pipes must<br />

be installed.<br />

The plans for the work and the drilling reports are to be available for inspection by the supervisory<br />

official.<br />

§ 2. The operator will regularly check the gro<strong>und</strong>water in the measuring wells for the presence<br />

of pollution.<br />

For tank farms, at least every 2 years a gro<strong>und</strong>water investigation must take place, either by the<br />

operator, with equipment and according to a method approved by an environmental expert accredited<br />

in the discipline gro<strong>und</strong>water, or by the aforementioned environmental expert himself.<br />

Art. 5.17.3.13<br />

§ 1. Minimum extinguishing and cooling provisions<br />

A tank farm for the storage of P1 and/or P2 products must be provided with an effective, permanent<br />

foam installation and/or an extinguishing or cooling installation suitable to the circumstances,<br />

and this after consultation with the authorised fire service.<br />

The establishment must dispose of a quantity of water to be able to spray and/or cool the containers<br />

for a sufficient period. With the failure of the normal electricity supply, the working of<br />

the extinguishing or cooling installations must be assured by emergency power units or equivalent<br />

emergency installations.<br />

§ 2. Establishments with containers for the storage of P1 products classified in category 1<br />

which are not manned or only manned during ordinary working hours must, after consultation<br />

with the authorised fire brigade, be equipped with an effective smoke, gas or flame detection<br />

system which gives an alarm at a manned monitoring department.<br />

§ 3. For the storage of P1 and/or P2 products in tank farms, the firefighting resources must be<br />

examined when bringing into use by an expert accredited for the discipline external safety and<br />

risks for serious accidents or by an authorised expert, unless this inspection is wholly or partly<br />

conducted by the authorised fire brigade, by the Head of Prevention and Protection or by his<br />

appointed party after consultation with the authorised fire brigade.<br />

Art. 5.17.3.14<br />

The accessibility of the tank farm must be conceived in such a way that:<br />

1. traffic in the zones where a reasonable danger of fire and explosion exists must be kept to a<br />

minimum<br />

2. the tank farm must have easy access<br />

3. easy access for the intervention material<br />

4. vehicles with which products are taken away or delivered must, during loading or unloading,<br />

to the extent technically possible be located at a loading/unloading place with larger dimensions<br />

than an ordinary road lane.<br />

394 Waste Water and Waste Gas Treatment