06.12.2012 Aufrufe

BVT-Merkblatt zu Abwasser- und Abgasbehandlung

BVT-Merkblatt zu Abwasser- und Abgasbehandlung

BVT-Merkblatt zu Abwasser- und Abgasbehandlung

MEHR ANZEIGEN
WENIGER ANZEIGEN

Erfolgreiche ePaper selbst erstellen

Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.

Annexes<br />

1. single-walled containers<br />

2. double-walled containers inside a water abstraction area or a protected zone type I and II<br />

3. double-walled containers inside the surro<strong>und</strong>ing area of electrical conductors where major<br />

stray currents can be present.<br />

From the date of the first general inspection, the periodic examinations must be conducted according<br />

to the provisions of article 5.17.2.8 and 5.17.2.9.<br />

§ 5. Without prejudice to the particular conditions imposed in the environmental licence, the<br />

containers must comply with the provisions of this chapter no later than the dates mentioned in<br />

the table below related to:<br />

1. overfilling warning or safety system<br />

2. leak detection<br />

3. cathodic protection.<br />

Location with respect to water abstraction<br />

areas or protected zones<br />

Product Category Inside Outside<br />

P1, P2 1, 2, 3 1 August 1998 1 August 2000<br />

P3, P4 1, 2 1 August 1998 1 August 2000<br />

P3, P4 3 1 August 1999 1 August 2001<br />

other 1, 2, 3 1 January 2003 1 January 2005<br />

§ 6. With the replacement of the containers referred to in § 1 or § 2, the new container must<br />

comply with all conditions of these regulations, except for that regarding the stipulations of<br />

distances to be observed.<br />

§ 7. For storage sites which form part of a fuel distribution installation for motor vehicles, the<br />

provisions of § 5 can be departed from according to the provisions of article 5.17.5.7.<br />

Art. 5.17.2.12<br />

§ 1. If leaks are observed the operator will take all measures required to avoid the danger of<br />

explosion and restrict further soil and gro<strong>und</strong>water pollution to the extent possible.<br />

§ 2. After professional repairs have taken place, the container may only be brought back into<br />

use providing it has successfully <strong>und</strong>ergone a seal test as specified in article 5.17.2.8.<br />

§ 3. With the final putting out of use of containers, whether or not due to leaks, the container<br />

must be emptied, cleaned and removed within a period of 36 months without prejudice to the<br />

provisions of the decree of 2 July 1981 concerning the prevention of waste and waste materials<br />

management and its implementing decisions.<br />

With the material impossibility of removal, within the same term, after consultation with an<br />

environmental expert accredited in the discipline containers for gases or hazardous substances,<br />

with an authorised expert or for the storage of P3 and/or P4 products intended for the heating of<br />

buildings or with an accredited technician, the container must be emptied, cleaned and filled<br />

with sand, foam or an equivalent inert material. Here the necessary measures relating to explosion<br />

safety and the prevention of gro<strong>und</strong>water pollution must be taken.<br />

§ 4. Liquids which have caused gro<strong>und</strong> pollution or spillage into the sewer system, the surface<br />

waters, the gro<strong>und</strong>water layers or onto adjacent properties must be immediately reported by the<br />

operator to the Environmental Inspection Department, to the Governor of the Province and to<br />

the Burgomaster.<br />

Waste Water and Waste Gas Treatment 389

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!