06.12.2012 Aufrufe

BVT-Merkblatt zu Abwasser- und Abgasbehandlung

BVT-Merkblatt zu Abwasser- und Abgasbehandlung

BVT-Merkblatt zu Abwasser- und Abgasbehandlung

MEHR ANZEIGEN
WENIGER ANZEIGEN

Erfolgreiche ePaper selbst erstellen

Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.

Annexes<br />

Art.5.17.2.6<br />

§ 1. The monitoring of the construction must take place in accordance with the provisions of<br />

appendix 5.17.2.<br />

The monitoring of separately constructed containers is done by an environmental expert accredited<br />

in the discipline containers for gases or hazardous substances, or by an authorised expert.<br />

The control of containers installed in series may be limited to one prototype. The approval of<br />

the prototype is given by an environmental expert accredited in the discipline containers for<br />

gases or hazardous substances, of which the accreditation allows the approval of prototypes.<br />

The report on this approval mentions the controls carried out and must be signed by the aforementioned<br />

expert.<br />

§ 2. For each container the operator must dispose of a "declaration of conformity of the container"<br />

signed by the constructor, drawn up according to the specimen form in appendix 5.17.2.<br />

The containers must be provided with the identification plate applied by the constructor.<br />

Art. 5.17.2.7<br />

Before the installation of the container, either directly in the gro<strong>und</strong> or in a trench, it must be<br />

checked whether the container and where appropriate also the trench meet the conditions of<br />

these regulations.<br />

After installation but before the bringing into use of the container, it must be checked whether<br />

the container, the ducts and the accessories, overfilling warning or safety system, the leak detection<br />

system and, where appropriate, the cathodic protection and the provisions for vapour<br />

recovery comply with the conditions of these regulations.<br />

The specified controls must be carried out <strong>und</strong>er the supervision of an environmental expert<br />

accredited in the discipline containers for gases or hazardous substances or an authorised expert,<br />

or with a technician accredited for the storage of P3 and/or P4 products intended for the<br />

heating of buildings.<br />

The monitoring of any cathodic protection must take place in collaboration with an environmental<br />

expert accredited in the discipline soil corrosion.<br />

Art. 5.17.2.8<br />

§ 1. At least once a year for containers located in water abstraction areas and protected zones<br />

and every two years for containers located in the other areas, the installation must be subjected<br />

to a limited examination, comprising if relevant:<br />

1. perusal of the previous report or certificate<br />

2. the checking of the good state of the overfilling protection<br />

3. checking for the presence of water and sludge in single-walled containers for liquid fuels<br />

(appendix 5.17.4)<br />

4. an inspection for any visible or organoleptically observable pollution on the surface outside<br />

the container (appendix 5.17.4)<br />

5. an examination of the state of the external visible parts of the container, the valves, ducts,<br />

pumps, etc.<br />

6. the checking of the effectiveness of any cathodic protection or corrosion monitoring<br />

7. the checking of the effectiveness of the leak detection system<br />

8. the checking of the effectiveness of the provisions for vapour recovery.<br />

386 Waste Water and Waste Gas Treatment

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!