Teil 3 Seite 4-43 Table 4-12: Properties of the treated effluent at the Kraftisried animal carcass disposal plant Parameters Average Mini- mum - maximum BSB5 homogenised mg/l 3,1 1 - 8 COD homogenised mg/l 65,4 35 - 125 NH4 -N mg/l 10,0 0,3 - 29 NO3 -N mg/l 2,4 0,3 - 7,7 NO2 -N mg/l 1,8 0,7 - 4 P total mg/l 1,8 0,3 - 4,3 AOX mg/l 0,015 < 0,01 - 0,02 GF 2 2 2 2. Genthin animal carcass disposal plant example, gemeinsame Behandlung mit Kom- munalabwasser? The clarification plant of the Genthin animal carcass disposal plant was designed for a raw material processing capacity of 580 Mg/d and dimensioned for full nitrogen elimina- tion. At this animal carcass disposal plant, 2 basins operated in parallel are utilised in con- junction with intermittent aeration. For the purposes of mechanical preliminary purification a fat separator, as well as flotation are utilised. Thereafter, domestic waste water eigenes oder kommunales? jeweils welche Anteile?is channelled into the effluent. It is then first transported to the clarification plant 2,5 km away through a pressure pipe into a mixing and equalisation basin (1.250 m 3 ; with a reserve of 1.750 m 3 ) and is then divided in paral- lel towards 2 activation basins of 6.240 m 3 each, in each of which 1.365 lfdm aerators and 3 stirring devices are installed. The basins are in alternation aerated at intervals (aerobic condition) or simply circulated (anoxic condition (time ratio approx. 2:1)). At a dry sludge content of 3g/l the BSB5, the sludge load is 0,08 kg/(kg×d) (Qd: 700 m 3 /d; Bd (BSB5): approx. 3.000 kg/d). A Dortmund tank serves as the final treatment basin before the effluent is directed into the Elbe-Havel Channel through a fining pond (approx. 2.200 m 3 ). Figure 4-7 provides a diagram of the clarification plant

Fe Fl Fe Fl P D MB Teil 3 Seite 4-44 P NK P D Grease-removal Fettabscheider tank Flotation Pumpstation Pressure Druckleitung line Misch- Mixing- und and Ausgleichsbecken Balanceponds BB NK SV SE LA ) Fi ni i ungsteich SV SE Activated Belebungbecken sludge tank Final Nachklärbecken sedimentation tank Activated Schlammvorlage sludge recei- Aktivated Schlammeindickung sludge thixotropie Agriculture Landwirtschaft Figure 4-7: Process diagram of intermittent nitrification/de-nitrification at the Genthin ani- mal carcass disposal plant Corporate clarification plant of the wholesale butchery of the company Tummel, Schlachthof, Germany This is an activation plant that has been in operation since 1955. This plant treats efflu- ent from the slaughterhouse, including rain water von verschmutzten Flächen. The slaughtering operation also has a tripe processing plant, in which intestines and stomachs are cleaned out and prepared for further processing. The retention of stomach and abdominal Pansen heißt “rumen” contents, as well as of the intestinal mucosa and the separate collection of blood, as well as the litter through dry preliminary cleansing are handled internally. Slaughtering figures and extent of further processing A maximum of 25.000 slaughter units (SU) can be slaughtered per week and 5.000 SU per slaughter day with 200 litres of effluent/SU. 1 Schwein = 1 Schlachteinheit; 1 Rind = 3-4 Schlachteinheiten je nach Größe Incidence of effluent and solid refuse component load (design data) Inflow equalising basin: Qd = 1.000 m 3 /slaughter day or alt. 120 m 3 /h Bd,BSB5 = 2.020 kg BSB5/slaughter day Bd,TKN = 360 kg TKN/slaughter day LA

Teil 3 Seite 4-43<br />

Table 4-12: Properties of the treated effluent at the Kraftisried animal carcass disposal<br />

plant<br />

Parameters Average Mini-<br />

mum<br />

- maximum<br />

BSB5 homogenised mg/l 3,1 1 - 8<br />

COD homogenised mg/l 65,4 35 - 125<br />

NH4 -N mg/l 10,0 0,3 - 29<br />

NO3 -N mg/l 2,4 0,3 - 7,7<br />

NO2 -N mg/l 1,8 0,7 - 4<br />

P total mg/l 1,8 0,3 - 4,3<br />

AOX mg/l<br />

0,015 < 0,01 -<br />

0,<strong>02</strong><br />

GF 2 2 2<br />

2. Genthin animal carcass disposal plant example, gemeinsame Behandlung mit Kom-<br />

munalabwasser?<br />

The clarification plant of the Genthin animal carcass disposal plant was <strong>des</strong>igned for a<br />

raw material processing capacity of 580 Mg/d and dimensioned for full nitrogen elimina-<br />

tion. At this animal carcass disposal plant, 2 basins operated in parallel are utilised in con-<br />

junction with intermittent aeration. For the purposes of mechanical preliminary purification<br />

a fat separator, as well as flotation are utilised. Thereafter, domestic waste water eigenes<br />

o<strong>der</strong> kommunales? jeweils welche Anteile?is channelled into the effluent. It is then first<br />

transported to the clarification plant 2,5 km away through a pressure pipe into a mixing<br />

and equalisation basin (1.250 m 3 ; with a reserve of 1.750 m 3 ) and is then divided in paral-<br />

lel towards 2 activation basins of 6.240 m 3 each, in each of which 1.365 lfdm aerators and<br />

3 stirring devices are installed. The basins are in alternation aerated at intervals (aerobic<br />

condition) or simply circulated (anoxic condition (time ratio approx. 2:1)). At a dry sludge<br />

content of 3g/l the BSB5, the sludge load is 0,08 kg/(kg×d) (Qd: 700 m 3 /d; Bd (BSB5): approx.<br />

3.000 kg/d). A Dortmund tank serves as the final treatment basin before the effluent is<br />

directed into the Elbe-Havel Channel through a fining pond (approx. 2.200 m 3 ). Figure 4-7<br />

provi<strong>des</strong> a diagram of the clarification plant