12.07.2015 Aufrufe

THE OFFICIAL MAGAZINE OF THE INTERNATIONAL BIATHLON ...

THE OFFICIAL MAGAZINE OF THE INTERNATIONAL BIATHLON ...

THE OFFICIAL MAGAZINE OF THE INTERNATIONAL BIATHLON ...

MEHR ANZEIGEN
WENIGER ANZEIGEN

Sie wollen auch ein ePaper? Erhöhen Sie die Reichweite Ihrer Titel.

YUMPU macht aus Druck-PDFs automatisch weboptimierte ePaper, die Google liebt.

venues schauplätzeIn addition, the photographers and media representativescan already look forward to a new, fast broadband internetconnection.The highlight will be the new, extremely short ways forteams and athletes as well as media. The stadium is designedto not let the media, teams and spectators interfereon each of their ways to their respective destinations, be itthe wax cabins, media center or stands thus creating veryeffective working conditions for everyone.Turned tracksThe “work zone” of the athletes, the shooting range andthe tracks, will also be remodeled. The first three lanes atthe shooting range will be taken down and put up again atwhat is now the end of the range, thus enlarging the area forphotographers and TV at the shooting range. The tracks willbe turned and changed so that the bridges are eliminated.Plans for RuhpoldingPläne für Ruhpoldingof the visitors to the athletes at the shooting range, whichmakes for the special Ruhpolding atmosphere, was oneof the main goals. Just like before, the shooting range willbe only a few meters away from the grand stand. A total of30 000 people will be able to watch the competitions in thestadium and along the course.Shortest ways for teams and mediaInside the stadium there won’t just be offices for the officialsbut also a new, big press center with enough roomfor the national and international media. The cabins for thecommentators will be installed on the roof of the stadiumand more can be put on walkways above the visitor stands.Nové Mesto na Morave: Dreams Come TrueIn Nové Mesto na Morave the new 2.5K paved rollerskiand inline skating loop has recently been completed, allowingimmediate preparations for the IBU Roller Cup 2 on thelast weekend in August and the 2011 IBU Summer BiathlonWCH.Wax and team cabinsAnother project currently underway is the construction ofa two-story building on the foundation of the current waxcabins. It will feature new, state-of-the-art wax cabins onthe ground floor; all equipped with heating and ventilationsystems according to IBU standards. Upstairs, there will beseveral multi-purpose rooms designed as team cabins, fullyequipped with showers and toilets which could serve as accommodationduring training camps in the summer. On thesame floor there will also be several competition offices.New loopOnce this is completed and the 2011 Y/JWCH is over, theProjections for NMNMModell für NMNMThe official Magazine of the IBU 20 I 2010 biathlonworld 103

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!