ensuring that the colour does not fade.<br />
KRONE has been investing in the “KTL<br />
plus powder”process for the last ten<br />
years. This is an electrocoating<br />
procedure, followed by powder<br />
coating,which guarantees top quality<br />
and an attractive appearance. After<br />
being blasted with steel balls in the<br />
blasting plant, the chassis is immersed<br />
ten times before being dried in the oven<br />
at 230 degrees Celsius. It is then<br />
transferred via a computer-controlled<br />
suspended railway to the assembly<br />
station. The technicians lay the<br />
colourful cables and install the<br />
powerful air suspension and the<br />
brakes. Here,they need to take account<br />
of the special features of each<br />
individual model.The piggyback model<br />
of the Mega Liner is given “split<br />
airbags”, for example,which ensure<br />
that the rubber bellows remain<br />
undamaged when the axles are<br />
repeatedly raised and lowered while<br />
the crane is being loaded.<br />
On the test bed<br />
The axle is then mounted, and shortly<br />
after that, the wheels are fitted. Now,<br />
an inspection is needed to check<br />
whether the electronics and brakes,for<br />
example, are working properly. The<br />
computer makes a meticulous<br />
examination.<br />
Once the computer has given the green<br />
light, the new vehicle is moved on to<br />
the next station, where the 30mmthick<br />
birch plywood floor is laid. Each<br />
vehicle is fitted with an individually<br />
made floor.Finally, it is furnished with<br />
the doors, front wall and roof, the<br />
tarpaulin is laid and the floor is sealed.<br />
Even when everything has been<br />
mounted,from the rungs through to the<br />
Edscha cover, the process is still not<br />
complete. As a final step, the vehicle<br />
needs to pass the Technical Inspection<br />
Authority test. Only then does KRONE<br />
Issue 1/06<br />
send the registration document to the<br />
customer, so that they can collect their<br />
new trailer. The customer replies by<br />
fax, informing KRONE when they wish<br />
to come and pick up the vehicle. On the<br />
agreed date, they bring their delivery<br />
papers with them, and drive out of the<br />
premises with the new trailer.In the<br />
meanwhile, the vehicles are registered<br />
by a barcode scanner and their location<br />
is passed on to the stores management<br />
system telemetrically. In this way,<br />
search times are avoided. The<br />
assembly technicians at KRONE work<br />
round the clock, six days a week, in<br />
three shifts.The only day off is Sunday,<br />
when the KTL basin also takes a rest.<br />
The entire production procedure is<br />
therefore minutely planned. But<br />
customers already come to expect this<br />
of their trailer manufacturer, since<br />
KRONE takes pride in its perfectionism.<br />
That’s why the company is regularly<br />
awarded prizes from specialist juries<br />
and satisfied customers.<br />
Nach der „Hochzeit“ von Chassis und Fahrwerk<br />
rollen Anhänger und Auflieger auf den eigenen<br />
Reifen zur Endmontage.<br />
After the “marriage” of the chassis to the<br />
undercarriage, the trailers roll on their own<br />
wheels to the final assembly.<br />
Die Luftfederung des Mega Liner „Huckepack“.<br />
The air suspension in the “piggyback” Mega Liner.<br />
Modernste Fertigungsanlagen und -techniken unterstützen die<br />
KRONE Mitarbeiter an allen Arbeitsstationen.<br />
KRONE employees are supported at every working station by the<br />
most modern production facilities and technologies.<br />