10.07.2015 Aufrufe

SAB Journal 2007 - Sportanglerbund Vöcklabruck

SAB Journal 2007 - Sportanglerbund Vöcklabruck

SAB Journal 2007 - Sportanglerbund Vöcklabruck

MEHR ANZEIGEN
WENIGER ANZEIGEN

Sie wollen auch ein ePaper? Erhöhen Sie die Reichweite Ihrer Titel.

YUMPU macht aus Druck-PDFs automatisch weboptimierte ePaper, die Google liebt.

7The following constraints are valid for the system:− Exhaust gases leave the IC engine at a temperature of 250 to 550 o C.− The exhaust gases may not be cooled in the heat recovery heat exchangerbelow 175 o C. The heat of condensation of water vapour in the exhaust gas isnot recovered.− Chilled water leaves the absorption machine at 6 to 7 o C and is returned to themachine at ca 12 o C.− Heat from the absorption machine is rejected to a 32/37 o C cooling tower, i.e.the coolant leaves the absorption machine at 37 o C, is cooled to 32 o C in thecooling tower and returned to the absorption machine.Thus, the components in the trigeneration system that are specific to theabsorption cycle are: a heat recovery heat exchanger, an absorption coolingmachine and a cooling tower. The cooling demand determines the capacity of thecooling machine, which in its turn determines the size of heat exchanger andcooling tower.It may be expected that electricity, heat and cooling demands placed on thetrigeneration system will vary widely depending on location, on size etc. In orderto determine which range of cooling capacities is relevant, experience within theorganisations taking part in the present project and available statistics have beensurveyed. It was decided to use for this study a set of five cooling capacities, 200kW th , 400 kW th , 600 kW th , 1000 kW th and 1400 kW th that spans the range fromsmall hotels to large hotels.In the CHCP system considered above it is assumed that only exhaust heat isutilised to power the absorption cooling machine. This is true in the case of a gasturbine, the exhaust of which is used to produce steam in a HRSG. However, aswritten in the document ”Energy savings by CHCP plants in the hotel sector”,other solutions may be considered. One is utilising both heat from the coolingjacket and exhaust heat to produce hot water that powers the absorptionmachine.4. Survey of the absorption cycle marketThere are several suppliers of absorption cooling equipment and absorptionrefrigeration equipment throughout the world. Not all of them supply to theEuropean market. Firms that have manufactured absorption cycle equipment formany years and are well-known may have discontinued activities in this domain.New firms may have recently started activities. Although our ambition has beento be as complete as possible, it has not been feasible to get into contact with allmanufacturers that were known to us.f:\chose\relfinal\appendix absorption chillers.doc47 12 75-D-SW-03 Date: 2001-05-31

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!