01.11.2013 Aufrufe

Installation Instructions - DEHN (UK)

Installation Instructions - DEHN (UK)

Installation Instructions - DEHN (UK)

MEHR ANZEIGEN
WENIGER ANZEIGEN

Erfolgreiche ePaper selbst erstellen

Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.

- Screw 2 rail fixing clamps, Part No. 105 354,<br />

(clamping range of the supporting tube 40 to 50 mm) on the tube support.<br />

Apply a tightening torque of 10 Nm!<br />

- Screw supporting tube on the tube support using the two rail fixing<br />

clamps (see Fig. 9).<br />

Earthing<br />

An equipotential bonding conductor<br />

leads the special integrated sealing<br />

end out of the supporting tube and is<br />

directly connected to the tube support<br />

using a pipe clamp (Part No. 540 100<br />

or 540 103). Where necessary, the<br />

conductor can be cut to length.<br />

The earth connection (clamp) on the<br />

rafter holder also serves as direct<br />

connection to the equipotential<br />

bonding system (min. 6 mm2 Cu) (see<br />

Fig. 9, detail).<br />

Al supporting tube<br />

tube support<br />

2 rail fixing clamps<br />

pipe clamp<br />

detail<br />

equipotential<br />

bonding conductor<br />

equipotential bonding<br />

(clamp, earth connection)<br />

Fig.<br />

9<br />

Page 9<br />

1759_MO_0811_DE_GB_059294

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!