Einbauanleitung
Einbauanleitung
Einbauanleitung
Erfolgreiche ePaper selbst erstellen
Machen Sie aus Ihren PDF Publikationen ein blätterbares Flipbook mit unserer einzigartigen Google optimierten e-Paper Software.
5. Sealing<br />
The aluminium roof tile/transition point to the air-termination rod/air-termination tip must be<br />
sealed as follows:<br />
Cut the rubber sleeve to length according to<br />
the diameter of the air-termination<br />
rod/air-termination tip<br />
Adjust the rubber sleeve to the aluminium roof tile<br />
Attach the sealing tape around the transition<br />
point to the air-termination<br />
rod/air-termination tip<br />
Bild<br />
6. Down conductor / Earthing<br />
Bild<br />
10<br />
10<br />
13<br />
rubber sleeve<br />
sealing tape<br />
The down conductor is connected to the nearest air-termination or earth-termination system<br />
using e.g. an MV clamp (for air-termination rods) while ensuring that the required separation<br />
distance is maintained.