01.08.2013 Aufrufe

Treaty Series Recueil des Traites - United Nations Treaty Collection

Treaty Series Recueil des Traites - United Nations Treaty Collection

Treaty Series Recueil des Traites - United Nations Treaty Collection

MEHR ANZEIGEN
WENIGER ANZEIGEN

Sie wollen auch ein ePaper? Erhöhen Sie die Reichweite Ihrer Titel.

YUMPU macht aus Druck-PDFs automatisch weboptimierte ePaper, die Google liebt.

250 <strong>United</strong> <strong>Nations</strong> - <strong>Treaty</strong> <strong>Series</strong> 1964<br />

Special provisions :<br />

1. The frontier population resident in the Kingdom of the Netherlands and Netherlands<br />

frontier control and Customs officers shall have a right of passage in accordance with<br />

the terms of section 2 with respect to the frontier roads.<br />

2. The Federal Republic of Germany shall ensure that there is no surface run-off of<br />

high water from the Walchumer Schloot and the Brualer Schloot into Netherlands<br />

territory.<br />

Course of the frontier<br />

Section 45<br />

Kloster Diinebroek/Bellingwolde<br />

From boundary-stone 186, the new frontier shall run for approximately 25 m along a<br />

prolongation of the old frontier between boundary-stones 1851 and 186, and thence in a<br />

straight line to a point approximately 20 m north-east of boundary-stone 187 on the old<br />

frontier between boundary-stones 187 and 188.<br />

Course o/the frontier :<br />

Section 46<br />

BunderneulandINieuweschans<br />

From a point 185 m south-west of boundary-stone 193 on the old frontier, the new<br />

frontier shall run along the arc of a circle which passes through a point 40.65 m south of<br />

boundary-stone 194 and meets a prolongation of the long straight section of the frontier<br />

between boundary-stones 196 and 195' at a tangent. From that meeting-point, it shall<br />

continue in a straight line to the bend in the old frontier approximately 26 m south-east of<br />

boundary-stone 195'.<br />

Special provisions :<br />

1. The Kingdom of the Netherlands proposes to construct a new road south of the<br />

village of Nieuweschans within a period of five years following the entry into force of this<br />

<strong>Treaty</strong>. In the course of construction of the road, the Wymeerer Sieltief will be diverted<br />

to the southern side of the new frontier. Pending diversion of the Wymeerer Sieltief, the<br />

rectification of the frontier shall be without prejudice to the enjoyment rights and maintenance<br />

obligations of the two si<strong>des</strong> relating to that watercourse.<br />

2. All costs arising out of the construction of the new road and the diversion of the<br />

Wymeerer Sieltief shall be borne by the Kingdom of the Netherlands. Such costs shall<br />

include compensation payments to owners of land which is directly or indirectly affected<br />

by the construction works.<br />

3. The competent German authorities shall render assistance to the competent<br />

Netherlands authorities in connexion with the diversion of the Wymeerer Sieltief.<br />

No. 7404

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!