ANHANG<br />
Summary<br />
Bridge designs in Wilhelmsburg Mitte<br />
Renewal of Wilhelmsburg Mitte continues<br />
to make progress. Step by step<br />
the architectural design of the numerous<br />
newbuild projects is emerging and<br />
the open spaces are taking shape. The infrastructure<br />
in this area is also being radically<br />
renewed – from streets and squares to canals<br />
or bodies of water, and the new bridge linking<br />
Mitte to the Wilhelmsburg train station<br />
and station mall.<br />
In connection with the renewal, several<br />
smaller bridges will be built by 2013 as part<br />
of the network of pedestrian and cycle paths.<br />
These seemingly small projects must also<br />
succeed in meeting highest expectations in<br />
terms of quality and design. This is especially<br />
true of the bridges because the intention is<br />
that their combined effect will contribute to<br />
a harmonious yet distinctive look for Mitte.<br />
38<br />
+The purpose of the consultation procedure<br />
was to ask experts to design all the bridges<br />
for the location with reference to the technical<br />
specifications, and to do so in such a way<br />
that, although recognizably functional elements,<br />
they make an aesthetic statement in<br />
a newly arising urban infrastructure. The objective<br />
of the consultation procedure was<br />
therefore to obtain proposals for individual<br />
bridges that follow a guiding design principle<br />
which could be applied to all other bridges to<br />
be built in Wilhelmsburg Mitte.<br />
The following bridges were the object of the<br />
consultation procedure:<br />
1. Bridge at Gert-Schwämmle-Weg<br />
2. Bridge over the canoe course including a<br />
jetty under the Wilhelmsburger<br />
Reichsstrasse<br />
3. Landscape bridge over the canoe course<br />
4. Landscape bridge in the igs main<br />
walkway<br />
Five teams of experts composed of architects<br />
and engineers were invited to apply<br />
themselves to the task and produce innovative<br />
proposals.<br />
The selection committee, chaired by Hamburg<br />
architect Karin Renner, unanimously<br />
awarded first place to the engineering office<br />
Schlaich Bergermann and Partner from<br />
Stuttgart. The jury’s view was that the winner’s<br />
design would succeed, with very simple<br />
means, in spanning the canals with bridges<br />
that are understated aesthetic highlights.<br />
This would enhance the park with a very<br />
beautiful element, not only for the pedestrians<br />
but also for the canoeists on the water<br />
below. The Stuttgart team’s design, in which<br />
the actual span of the bridge has a filigree<br />
look, was very well received. The bridges fit<br />
neatly into the network of paths in the park<br />
and do not attempt to be showy constructions<br />
in their own right. The details of the<br />
plans also played a big part in convincing the<br />
jury that this design should be recommended<br />
as the planning foundation for all bridges<br />
in Mitte.