25.02.2013 Aufrufe

PDF 3409KB - DAR - Bundesanstalt für Materialforschung und ...

PDF 3409KB - DAR - Bundesanstalt für Materialforschung und ...

PDF 3409KB - DAR - Bundesanstalt für Materialforschung und ...

MEHR ANZEIGEN
WENIGER ANZEIGEN

Sie wollen auch ein ePaper? Erhöhen Sie die Reichweite Ihrer Titel.

YUMPU macht aus Druck-PDFs automatisch weboptimierte ePaper, die Google liebt.

Summary of national notification system: SWEDEN<br />

informed? standardisation.<br />

Liability insurance SWEDAC must ascertain that the notified body has public liability insurance unless the notified body is a public authority (in that case<br />

the state is responsible for any damage caused by the notified body).<br />

1. Amount Neither the act, ordinance nor the regulation on conformity assessment or any other regulation specifies a liability assurance amount for<br />

notified bodies. The NBs are requested to analyze the risks involved when it comes to decide upon an amount.<br />

2. Type of risks covered The insurance should cover damage on persons and property as well as economic damage.<br />

3. MONITORING & SURVEILLANCE<br />

Responsibility for monitoring<br />

1. designation authority SWEDAC is responsible for the surveillance of notified bodies.<br />

2. accreditation body (if applicable)<br />

Practical aspects<br />

1. means of surveillance (witnessed<br />

assessments, audits, documentation review,<br />

etc.)<br />

2. frequency<br />

The yearly surveillance and reassessment follow the same principles as in accreditation. SWEDAC performs so-called witnessed<br />

assessments. This means that as one element of the assessment and surveillance process, SWEDAC from time to time, accompanies the<br />

notified body during the its assessment of a manufacturer. This will give SWEDAC a picture of the notified body at work and provides<br />

guidance for SWEDAC in assessing the notified body.<br />

• of surveillance The notified body will be subject to monitoring on a yearly basis.<br />

• of re-assessment, if applicable The notified body will be subject to a complete reassessment every fourth year.<br />

Reporting requirements<br />

4

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!