DEU ENG RUS ITA DAN Parallel operation QSK EC HK 4-pipes – BMS control 0-10 V BMS signal 0 -10 V Service Motor Motor All QSK HK must be connected in parallel. Ring closing and star connection are inadmissible. The power current at the same supply line must not exceed 6 A! Depending on the circumstances on site, additional mains infeed points must be provided! * 2-pipes: Only the heating actuation is served. Everything else must be programmed in the installation on site. 2 Cooling 2 actuation* Cooling actuation* 2 Heating actuation* 2 Heating actuation* 56 Service
Installation Remove the protective cover permanently only after finishing the installation of the system convector and after finishing all building work. By this you avoid contamination and damage to the system convector. Connection compartment covers (optional) Connection compartment covers are available as optional accessories for every convector size. These can be ordered together with the convector, or subsequently stating the corresponding type of convector. Position the connection compartment covers onto the bulkhead profiles as shown. 57 Decorative roll grille Installation of decorative roll grille The decorative roll grille is supplied with a small amount of excess length so that you can perform an exact length adaptation. 1. Remove the protective plates and attach the decorative roll grille on one side to the system convector. 2. Cut through the plastic connectors on the other side according to the overall length of the system convector. 124645.1223 QSK HK 260 | 320 | 360 DEU ENG RUS ITA DAN
- Page 5 and 6: Produktinformationen Bestimmungsgem
- Page 7 and 8: Voraussetzungen Fachkenntnisse Die
- Page 9 and 10: Montage Montagevorbereitung 1. Entf
- Page 11 and 12: Montage Systemerweiterungen Systemv
- Page 13 and 14: Anschlussvarianten 4. 1. 1. Wassera
- Page 15 and 16: Montage Elektrischer Anschluss Möh
- Page 17 and 18: Montage Elektrischer Anschluss - An
- Page 19 and 20: Montage Anschlussplan 4-Leiter im P
- Page 21 and 22: Montage Parallelbetrieb mehrerer QS
- Page 23 and 24: Montage Entfernen Sie die Montageab
- Page 25 and 26: Montage 3. Legen Sie den Designroll
- Page 27 and 28: Instandhaltung Wartung/Reinigung Re
- Page 29 and 30: Instandhaltung 7. Reinigen der Kond
- Page 31 and 32: HINWEIS REINIGUNGSMITTEL: Verwenden
- Page 33 and 34: Instandhaltung 4. Schottclip erneut
- Page 35 and 36: MANUAL Transversal flow fan system
- Page 37 and 38: Product overview Optional component
- Page 39 and 40: Product information Intended use M
- Page 41 and 42: Preconditions Expert knowledge The
- Page 43 and 44: Installation Installation preparati
- Page 45 and 46: Installation System extensions Syst
- Page 47 and 48: Connection variants 4. 1. 1. Water
- Page 49 and 50: Installation Electric connection As
- Page 51 and 52: Installation Electric connection -
- Page 53 and 54: ! Supply line 230 V AC 50 - 50 Hz I
- Page 55: Installation Parallel operation of
- Page 59 and 60: Installation 3. Insert the decorati
- Page 61 and 62: Maintenance Maintenance/cleaning ES
- Page 63 and 64: Maintenance 7. Cleaning the condens
- Page 65 and 66: NOTE ON CLEANING AGENTS: Use commer
- Page 67 and 68: Maintenance 4. Re-insertion of bulk
- Page 69 and 70: РУКОВОДСТВО Систем
- Page 71 and 72: Обзор изделия Опци
- Page 73 and 74: Информация о проду
- Page 75 and 76: Условия Специальны
- Page 77 and 78: Монтаж Подготовка
- Page 79 and 80: Монтаж Расширение
- Page 81 and 82: Варианты подключен
- Page 83 and 84: Монтаж Электрическ
- Page 85 and 86: Монтаж Электрическ
- Page 87 and 88: ! Монтаж Схема пара
- Page 89 and 90: Montage Параллельное п
- Page 91 and 92: Монтаж Окончательн
- Page 93 and 94: Монтаж 3. Установит
- Page 95 and 96: Ремонт Техническое
- Page 97 and 98: Ремонт 7. Очистка ва
- Page 99 and 100: ПРИМЕЧАНИЕ ПО ЧИСТ
- Page 101 and 102: Ремонт 4. Установка
- Page 103 and 104: MANUALE Convettore di sistema a ven
- Page 105 and 106: Panoramica sul prodotto Componenti
Installation<br />
Remove the protective cover permanently only after finishing the<br />
installation of the system convector and after finishing all building<br />
work. By this you avoid contamination and damage to the system<br />
convector.<br />
Connection compartment covers (optional)<br />
Connection compartment covers are available as optional accessories for<br />
every convector size. These can be ordered together with the convector,<br />
or subsequently stating the corresponding type of convector.<br />
Position the connection compartment covers onto the bulkhead profiles<br />
as shown.<br />
57<br />
Decorative roll grille<br />
Installation of decorative roll grille<br />
The decorative roll grille is supplied with a small amount of excess length<br />
so that you can perform an exact length adaptation.<br />
1. Remove the protective plates and attach the decorative roll grille on<br />
one side to the system convector.<br />
2. Cut through the plastic connectors on the other side according to the<br />
overall length of the system convector.<br />
124645.1223 <strong>QSK</strong> <strong>HK</strong> 260 | 320 | 360<br />
DEU<br />
ENG<br />
RUS<br />
ITA<br />
DAN