Руководство по установке QSK HK

Руководство по установке QSK HK Руководство по установке QSK HK

moehlenhoff.info
from moehlenhoff.info More from this publisher
29.08.2013 Views

DEU ENG RUS ITA DAN Parallel operation QSK EC HK 4-pipes – BMS control 0-10 V BMS signal 0 -10 V Service Motor Motor All QSK HK must be connected in parallel. Ring closing and star connection are inadmissible. The power current at the same supply line must not exceed 6 A! Depending on the circumstances on site, additional mains infeed points must be provided! * 2-pipes: Only the heating actuation is served. Everything else must be programmed in the installation on site. 2 Cooling 2 actuation* Cooling actuation* 2 Heating actuation* 2 Heating actuation* 56 Service

Installation Remove the protective cover permanently only after finishing the installation of the system convector and after finishing all building work. By this you avoid contamination and damage to the system convector. Connection compartment covers (optional) Connection compartment covers are available as optional accessories for every convector size. These can be ordered together with the convector, or subsequently stating the corresponding type of convector. Position the connection compartment covers onto the bulkhead profiles as shown. 57 Decorative roll grille Installation of decorative roll grille The decorative roll grille is supplied with a small amount of excess length so that you can perform an exact length adaptation. 1. Remove the protective plates and attach the decorative roll grille on one side to the system convector. 2. Cut through the plastic connectors on the other side according to the overall length of the system convector. 124645.1223 QSK HK 260 | 320 | 360 DEU ENG RUS ITA DAN

DEU<br />

ENG<br />

RUS<br />

ITA<br />

DAN<br />

Parallel operation <strong>QSK</strong> EC <strong>HK</strong> 4-pipes – BMS control 0-10 V<br />

BMS signal 0<br />

-10 V<br />

Service<br />

Motor Motor<br />

All <strong>QSK</strong> <strong>HK</strong> must be connected in parallel. Ring closing and star connection are inadmissible. The power current at the same supply line must not exceed 6 A! Depending on<br />

the circumstances on site, additional mains infeed points must be provided!<br />

* 2-pipes: Only the heating actuation is served. Everything else must be programmed in the installation on site.<br />

2 Cooling<br />

2<br />

actuation* Cooling actuation*<br />

2<br />

Heating<br />

actuation*<br />

2<br />

Heating actuation*<br />

56<br />

Service

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!