Руководство по установке QSK HK
Руководство по установке QSK HK Руководство по установке QSK HK
DEU ENG RUS ITA DAN ! Installation Connection plan 2-pipes in parallel operation – Control by AR 6010 KD DS 1000 Supply line 230 V AC 50 - 50 Hz 127041 AR 6010 KD The switch must be closed for the cooling application! Motor Motor Service LED 2 Heating actuation 54 Service LED 2 Heating actuation All QSK HK must be connected in parallel. Ring closing and star connection are inadmissible. The power current at the same supply line must not exceed 6 A! Depending on the circumstances on site, additional mains infeed points must be provided!
Installation Parallel operation of several QSK – building management system 0 - 10 V (BMS) BMS Mains connection 230 V/AC Max. fuse 6 A min. NYM 3 x 1.5 mm2 GLT I-Y(ST)Y 2 x 2 x 0.8 mm Control line I-Y(ST)Y recommended 2 x 2 x 0.8 mm 55 QSK HK Slaves GS 2000 QSK HK Slaves GS 2000 Incoming / outgoing line 230 V AC recommended NYM-J 3 x 1.5 mm2 Max. overall length of the control line 100 m QSK HK Master GS 2000 Max. 100 m of control line QSK HK Slaves GS 2000 Max. 15 GS 2000 in one group for activation! windowside windowside windowside For a parallel operation of several QSK HK, all further QSK HK can be completely wired. All devices are synchronised via the internal communication bus. And controlled by the BMS. The BMS may only be connected to one convector. The max. control line length must not exceed 100 m, starting from the master. QSK HK Slaves GS 2000 124645.1223 QSK HK 260 | 320 | 360 DEU ENG RUS ITA DAN
- Page 3 and 4: Produktübersicht Optionale Kompone
- Page 5 and 6: Produktinformationen Bestimmungsgem
- Page 7 and 8: Voraussetzungen Fachkenntnisse Die
- Page 9 and 10: Montage Montagevorbereitung 1. Entf
- Page 11 and 12: Montage Systemerweiterungen Systemv
- Page 13 and 14: Anschlussvarianten 4. 1. 1. Wassera
- Page 15 and 16: Montage Elektrischer Anschluss Möh
- Page 17 and 18: Montage Elektrischer Anschluss - An
- Page 19 and 20: Montage Anschlussplan 4-Leiter im P
- Page 21 and 22: Montage Parallelbetrieb mehrerer QS
- Page 23 and 24: Montage Entfernen Sie die Montageab
- Page 25 and 26: Montage 3. Legen Sie den Designroll
- Page 27 and 28: Instandhaltung Wartung/Reinigung Re
- Page 29 and 30: Instandhaltung 7. Reinigen der Kond
- Page 31 and 32: HINWEIS REINIGUNGSMITTEL: Verwenden
- Page 33 and 34: Instandhaltung 4. Schottclip erneut
- Page 35 and 36: MANUAL Transversal flow fan system
- Page 37 and 38: Product overview Optional component
- Page 39 and 40: Product information Intended use M
- Page 41 and 42: Preconditions Expert knowledge The
- Page 43 and 44: Installation Installation preparati
- Page 45 and 46: Installation System extensions Syst
- Page 47 and 48: Connection variants 4. 1. 1. Water
- Page 49 and 50: Installation Electric connection As
- Page 51 and 52: Installation Electric connection -
- Page 53: ! Supply line 230 V AC 50 - 50 Hz I
- Page 57 and 58: Installation Remove the protective
- Page 59 and 60: Installation 3. Insert the decorati
- Page 61 and 62: Maintenance Maintenance/cleaning ES
- Page 63 and 64: Maintenance 7. Cleaning the condens
- Page 65 and 66: NOTE ON CLEANING AGENTS: Use commer
- Page 67 and 68: Maintenance 4. Re-insertion of bulk
- Page 69 and 70: РУКОВОДСТВО Систем
- Page 71 and 72: Обзор изделия Опци
- Page 73 and 74: Информация о проду
- Page 75 and 76: Условия Специальны
- Page 77 and 78: Монтаж Подготовка
- Page 79 and 80: Монтаж Расширение
- Page 81 and 82: Варианты подключен
- Page 83 and 84: Монтаж Электрическ
- Page 85 and 86: Монтаж Электрическ
- Page 87 and 88: ! Монтаж Схема пара
- Page 89 and 90: Montage Параллельное п
- Page 91 and 92: Монтаж Окончательн
- Page 93 and 94: Монтаж 3. Установит
- Page 95 and 96: Ремонт Техническое
- Page 97 and 98: Ремонт 7. Очистка ва
- Page 99 and 100: ПРИМЕЧАНИЕ ПО ЧИСТ
- Page 101 and 102: Ремонт 4. Установка
- Page 103 and 104: MANUALE Convettore di sistema a ven
Installation<br />
Parallel operation of several <strong>QSK</strong> – building management system 0 - 10 V (BMS) BMS<br />
Mains connection<br />
230 V/AC Max. fuse<br />
6 A<br />
min. NYM 3 x<br />
1.5 mm2<br />
GLT<br />
I-Y(ST)Y 2 x 2 x 0.8 mm<br />
Control line I-Y(ST)Y recommended<br />
2 x 2 x 0.8 mm<br />
55<br />
<strong>QSK</strong> <strong>HK</strong><br />
Slaves<br />
GS 2000<br />
<strong>QSK</strong> <strong>HK</strong><br />
Slaves<br />
GS 2000<br />
Incoming / outgoing line 230 V AC recommended<br />
NYM-J 3 x 1.5 mm2<br />
Max. overall length of the control line 100 m<br />
<strong>QSK</strong> <strong>HK</strong><br />
Master<br />
GS 2000<br />
Max. 100 m of control line<br />
<strong>QSK</strong> <strong>HK</strong><br />
Slaves<br />
GS 2000<br />
Max. 15 GS 2000 in one group for activation!<br />
windowside windowside windowside<br />
For a parallel operation of several <strong>QSK</strong> <strong>HK</strong>, all further <strong>QSK</strong> <strong>HK</strong> can be completely wired. All devices are synchronised via the internal communication bus. And controlled by the<br />
BMS. The BMS may only be connected to one convector. The max. control line length must not exceed 100 m, starting from the master.<br />
<strong>QSK</strong> <strong>HK</strong><br />
Slaves<br />
GS 2000<br />
124645.1223 <strong>QSK</strong> <strong>HK</strong> 260 | 320 | 360<br />
DEU<br />
ENG<br />
RUS<br />
ITA<br />
DAN