Руководство по установке QSK HK
Руководство по установке QSK HK Руководство по установке QSK HK
DEU ENG RUS ITA DAN Installation Flexible hoses (optional, only 2-pipes) We recommend the use of flexible hoses in order to allow an easy removal of the heat exchanger for cleaning purposes. Connect the hoses to the inlet and backflow valve. Please take care that the hoses are located in the connection compartment as shown. The beginning of the tube loop coming from the backflow/inlet direction must be on the upper side. Cooling circuit All tubes of the cooling circuits not positioned above the condensate trough must be installed diffusion-tight! Otherwise, damage to the building may occur due to condensed water. 46 Connection tubing Möhlenhoff QSK HK are available in 2 different widths. Each width can be equipped with a 2/4-pipe heat exchanger. Apart from that, all constructive dimensions of both variants are identical. v FL FL QSK ... HK 2L FL - Flow for heating mode BF - Backflow Condensate drain BF BF Every condensate trough within a QSK HK is provided with a connection for draining the condensate (see page 4; overview). Taking into account the planned installation structure and the media temperatures to be expected, please provide condensate drains at the construction site! FLC FLH FLC FLH BFC BFH BFH QSK ... HK 4L FLH - Flow for heating circuit BFH - Backflow for heating circuit FLC - Flow for cooling circuit BFC - Backflow for cooling circuit Observe the Waste Water Regulations BFC
Connection variants 4. 1. 1. Water connection 1. Variant: front side 2. 3. Variant: room-side Alternatively possible: through bottom plate Condensate drain 4. 4a. 3. 3. 2. 2. front side connection 4a. Alternatively possible: room-side 47 Condensate pump (option)* It is very important to clean the condensate collecting trough prior to installing the pump! Do not wire the condensate trough to the GS 2000! The Sauermann SI 1082 pump is equipped with a thermal overheating protection: Triggering at 90 °C. Pump outlet side: The pump outlet side must be connected to the waste water line with a hose with an interior diameter of 6 mm. The Sauermann accessory part ACC00205 (not included in the scope of delivery) allows a quick and easy connection of the pump pressure line to the waste water line. Water level A Alarm, 21 mm +/-2 B Switch-on, 18 mm +/-2 C Switching off the pump, 12 mm +/-2 *Please also observe the supplied instructions of the company Sauermann for the consensate pump SI 1082. C B A 124645.1223 QSK HK 260 | 320 | 360 DEU ENG RUS ITA DAN
- Page 1 and 2: HANDBUCH Querstromgebläse-Systemko
- Page 3 and 4: Produktübersicht Optionale Kompone
- Page 5 and 6: Produktinformationen Bestimmungsgem
- Page 7 and 8: Voraussetzungen Fachkenntnisse Die
- Page 9 and 10: Montage Montagevorbereitung 1. Entf
- Page 11 and 12: Montage Systemerweiterungen Systemv
- Page 13 and 14: Anschlussvarianten 4. 1. 1. Wassera
- Page 15 and 16: Montage Elektrischer Anschluss Möh
- Page 17 and 18: Montage Elektrischer Anschluss - An
- Page 19 and 20: Montage Anschlussplan 4-Leiter im P
- Page 21 and 22: Montage Parallelbetrieb mehrerer QS
- Page 23 and 24: Montage Entfernen Sie die Montageab
- Page 25 and 26: Montage 3. Legen Sie den Designroll
- Page 27 and 28: Instandhaltung Wartung/Reinigung Re
- Page 29 and 30: Instandhaltung 7. Reinigen der Kond
- Page 31 and 32: HINWEIS REINIGUNGSMITTEL: Verwenden
- Page 33 and 34: Instandhaltung 4. Schottclip erneut
- Page 35 and 36: MANUAL Transversal flow fan system
- Page 37 and 38: Product overview Optional component
- Page 39 and 40: Product information Intended use M
- Page 41 and 42: Preconditions Expert knowledge The
- Page 43 and 44: Installation Installation preparati
- Page 45: Installation System extensions Syst
- Page 49 and 50: Installation Electric connection As
- Page 51 and 52: Installation Electric connection -
- Page 53 and 54: ! Supply line 230 V AC 50 - 50 Hz I
- Page 55 and 56: Installation Parallel operation of
- Page 57 and 58: Installation Remove the protective
- Page 59 and 60: Installation 3. Insert the decorati
- Page 61 and 62: Maintenance Maintenance/cleaning ES
- Page 63 and 64: Maintenance 7. Cleaning the condens
- Page 65 and 66: NOTE ON CLEANING AGENTS: Use commer
- Page 67 and 68: Maintenance 4. Re-insertion of bulk
- Page 69 and 70: РУКОВОДСТВО Систем
- Page 71 and 72: Обзор изделия Опци
- Page 73 and 74: Информация о проду
- Page 75 and 76: Условия Специальны
- Page 77 and 78: Монтаж Подготовка
- Page 79 and 80: Монтаж Расширение
- Page 81 and 82: Варианты подключен
- Page 83 and 84: Монтаж Электрическ
- Page 85 and 86: Монтаж Электрическ
- Page 87 and 88: ! Монтаж Схема пара
- Page 89 and 90: Montage Параллельное п
- Page 91 and 92: Монтаж Окончательн
- Page 93 and 94: Монтаж 3. Установит
- Page 95 and 96: Ремонт Техническое
DEU<br />
ENG<br />
RUS<br />
ITA<br />
DAN<br />
Installation<br />
Flexible hoses (optional, only 2-pipes)<br />
We recommend the use of flexible hoses in order to allow an easy removal<br />
of the heat exchanger for cleaning purposes. Connect the hoses to the<br />
inlet and backflow valve.<br />
Please take care that the hoses are located in the connection compartment<br />
as shown. The beginning of the tube loop coming from<br />
the backflow/inlet direction must be on the upper side.<br />
Cooling circuit<br />
All tubes of the cooling circuits not positioned above the condensate<br />
trough must be installed diffusion-tight! Otherwise, damage to the<br />
building may occur due to condensed water.<br />
46<br />
Connection tubing<br />
Möhlenhoff <strong>QSK</strong> <strong>HK</strong> are available in 2 different widths. Each width can be<br />
equipped with a 2/4-pipe heat exchanger. Apart from that, all constructive<br />
dimensions of both variants are identical.<br />
v<br />
FL<br />
FL<br />
<strong>QSK</strong> ... <strong>HK</strong> 2L<br />
FL - Flow for heating mode<br />
BF - Backflow<br />
Condensate drain<br />
BF<br />
BF<br />
Every condensate trough within a <strong>QSK</strong> <strong>HK</strong> is provided with<br />
a connection for draining the condensate (see page 4; overview).<br />
Taking into account the planned installation structure<br />
and the media temperatures to be expected, please<br />
provide condensate drains at the construction site!<br />
FLC<br />
FLH<br />
FLC<br />
FLH<br />
BFC<br />
BFH<br />
BFH<br />
<strong>QSK</strong> ... <strong>HK</strong> 4L<br />
FLH - Flow for heating circuit<br />
BFH - Backflow for heating circuit<br />
FLC - Flow for cooling circuit<br />
BFC - Backflow for cooling circuit<br />
Observe the Waste Water Regulations<br />
<br />
<br />
BFC